Region L Water Plan

Overview

Counties

Aquifers

Rivers

Entities

About

Contents in Vol. I

 

Select a section in Volume I of the Regional Water Plan, and you can click to view all the text, figures and tables listed in the Table of Contents.

Cover      Executive Summary     Section 1     Section 2     Section 3     Section 4     Section 5     Section 6     Section 7    Appendices


Cover Sheets:   Cover Page      Table of contents graph      Region - (small map)

 

Executive Summary Text

Executive Summary Text

(Text linked to Figures ES-1 to 17 and Tables ES-1 to 3)

Executive Summary Figures ES-1 to ES-17

ES-1                South Central Texas Planning Region (Region L)
ES-2                Plan Structure
ES-3                Projected Water Demands
ES-4                Distribution of Total Demand Among Users
ES-5                Supply, Demand, and Need (Shortage)
ES-6                Projected Water Needs (Shortages)
ES-7                Counties with Projected Municipal Needs (Shortages)
ES-8                Cities with Projected Needs (Shortages)
ES-9                Counties with Projected Industrial Needs (Shortages)
ES-10              Counties with Projected Steam-Electric Needs (Shortages)
ES-11              Counties with Projected Irrigation Needs (Shortages)
ES-12              Counties with Projected Mining Needs (Shortages)
ES-13              Regional Planning Process.
ES-14              Sources of New Supply
ES-15              Phased Implementation of Water Management Strategies
ES-16              Regional Water Plan — Annual Cost of Cumulative Additional Water Supply
ES-17              Regional Water Plan — Unit Cost of Cumulative Additional Water Supply

      Regional Water Plan for Counties and for Major Water Providers: 
                      Bexar County:   a   b   c   d    
      Caldwell, Calhoun and Comal Counties 
      Dimmitt, Frio and Goliad Counties 
      Gonzales and Guadalupe Counties 
      Hays, Karnes and Kendall Counties 
      LaSalle, Medina and Regugio Counties 
      Uvalde, Victoria and Wilson Counties 
      Zavala, Regional Provider, SAWS   Major Providers, continued
    

Executive Summary – Tables ES-1 to ES-3

ES-1       South Central Texas Regional Water Planning Group Members     ES-2

ES-2       Major Water Providers and Service Areas ES-15

ES-3       Regional Water Supply Plan Summary  ES-23 
    
 
Section 1 - Text

Section 1 Part a Text – Sections 1.1 to 1.6

Section 1 Part b Text – Sections 1.7 to 1.8

Section 1 Part c Text – Sections 1.9 to 1.10.3

(Text linked to Figures 1-1 to 1-6 and Tables 1-1 to 1-14)

 

Section 1 Part d Text – Section 1.10.4

Section 1 Part e Text -  Section 1.10.5 to 1.12

 

Section  1 - Figures 1-1 to 1-6
1-1             Eco-Regions — South Central Texas Region
1-2             Percentages of Population Residing in Urban and Rural Areas (1990)
1-3              Age Distribution of the Population (1990)
1-4             Level of Educational Achievement (1990)
1-5             Major Aquifers
1-6             River Basins, Coastal Basins, Reservoirs, and Lakes

 

Section 1 – Tables 1-1 to 1-14

  1-1                 South Central Texas Region – List of Counties (Location by
River Basin and Edwards Aquifer Area)
  1-3

  1-2                 Climatological Data for South Central Texas Region 1-4

  1-3                 Agricultural Resources — 1997 1-12

  1-4                 Population Growth – 1950 to 1998  1-14

  1-5                 Major Cities in the South Central Texas Region1-15

  1-6                 County Population and Area1-16

  1-7                 Summary of Farm Production Data - 19971-19

  1-8                 Summary of Livestock Production Data - 19971-21

  1-9                 Summary of Manufacturing Activity - 19921-23

1-10                 Trades and Services Industry - 19921-25

1-11                 Groundwater Availability by Aquifer  1-38

1-12                 List of Major Reservoirs1-43

1-13                 Summary of Run-of-River Water Rights1-45

1-14                 Summary of Plans/Studies Submitted to the SCTRWPG  1  2  3  4  5  1-54

 

Section 2 - Text

 Section 2 Text
(
Text linked to Figures 2-1 to 2-6 and Tables 2-1 to 2-13)

   

Section  2 - Figures 2-1 to 2-6
2-1                Summary of South Central Texas Region’s Projected Population
2-2                Projected Per Capita Water Use and Municipal Water Demand
2-3                Projections of Industrial, Steam-Electric, and Mining Water Demands
2-4                Projections  of Irrigation Water Demands
2-5                Projections  of Livestock Water Demands
2-6                Total  Water Demand Projections

 

Section  2 - Tables 2-1 to 2-13

  2-1                 South Central Texas Region – List of Counties (Location by
River or Coastal Basin and Edwards Aquifer Area)
2-2

  2-2                 Population Projections (Individual Counties with River and
Coastal Basin Summaries)
2-3

  2-3                 Population Projections (River and Coastal Basins, Counties,
and Cities)
................................................................................................ 2-5

  2-4                 Municipal Water Demand Projections (Individual Counties
with River Basin Summaries)
.................................................................. 2-13

  2-5                 Industrial Water Demand Projections (Individual Counties
with River Basin Summaries)
.................................................................. 2-17

  2-6                 Steam-Electric Power Water Demand Projections (Individual
Counties with River Basin Summaries)
................................................... 2-18

  2-7                 Mining Water Demand Projections (Individual Counties with
River Basin Summaries)
.......................................................................... 2-19

  2-8                 Irrigation Water Demand Projections  (Individual Counties
with River Basin Summaries)
.................................................................. 2-22

  2-9                 Livestock Water Demand Projections (Individual Counties
with River Basin Summaries)
.................................................................. 2-25

2-10                 Total Water Demand Projections  (Individual Counties with
River Basin Summaries)
.......................................................................... 2-28

2-11                 Composition of Total Water Use.............................................................. 2-29

2-12                 Water Demand Projections –  (River, Basins,
Counties, and Cities)
................................................................................ 2-32

2-13                 Water Demand Projections for Major Water Providers........................... 2-52

 

Section 3 - Text

Section 3 Text

(Text linked to Figures 3-1 and 3-2 and Tables 3-1 to 3-5)

 

 

Section 3 - Figures 3-1 and 3-2
3-1                Major Aquifers – South Central Texas Region
3-2                River Basins, Coastal Basins, Reservoirs, and Lakes (South Central   Texas Region)

    

Section 3 - Tables 3-1 to 3-5

  3-1                 Groundwater Availability by Aquifer.......................................................... 3-5

  3-2                 List of Major Reservoirs............................................................................ 3-8

  3-3                 Summary of Run-of-River Water Rights.................................................. 3-10

  3-4                 Identification and Initiation of Drought Responses................................... 3-12

  3-5                 Summary of Draft Edwards Aquifer Authority Critical Period
Management Rules
.................................................................................. 3-13

Section 4 - Text

Section 4 Text
(
Text linked to Tables 4-1 to 4-28)

 

Section 4 - Tables 4-1 to 4-28

  4-1                 Projected Water Demands, Supplies, and Needs – Atascosa County... 4-3

  4-2                 Projected Water Demands, Supplies and Needs – Bexar County.......... 4-8

  4-3                 Projected Water Demands, Supplies and Needs – Caldwell County...... 4-14

  4-4                 Projected Water Demands, Supplies and Needs – Calhoun County...... 4-19

  4-5                 Projected Water Demands, Supplies, and Needs – Comal County........ 4-25

  4-6                 Projected Water Demands, Supplies and Needs – DeWitt County........ 4-30

  4-7                 Projected Water Demands, Supplies, and Needs – Dimmit County....... 4-37

  4-8                 Projected Water Demands, Supplies and Needs – Frio County............. 4-42

  4-9                 Projected Water Demands, Supplies, and Needs – Goliad County........ 4-46

4-10                 Projected Water Demands, Supplies and Needs – Gonzales County.... 4-51

4-11                 Projected Water Demands, Supplies, and Needs – Guadalupe County. 4-56

4-12                 Projected Water Demands, Supplies and Needs – Hays County (part). 4-61

4-13                 Projected Water Demands, Supplies, and Needs – Karnes County....... 4-65

4-14                 Projected Water Demands, Supplies and Needs – Kendall County....... 4-72

 4-15                Projected Water Demands, Supplies, and Needs – LaSalle
County
...................................................................................................... 4-78

4-16                 Projected Water Demands, Supplies and Needs – Medina County........ 4-81

4-17                 Projected Water Demands, Supplies, and Needs – Refugio County...... 4-86

4-18                 Projected Water Demands, Supplies and Needs – Uvalde County........ 4-90

4-19                 Projected Water Demands, Supplies, and Needs – Victoria County...... 4-93

4-20                 Projected Water Demands, Supplies and Needs – Wilson County........ 4-100

4-21                 Projected Water Demands, Supplies, and Needs – Zavala County........ 4-106

4-22                 Projected Water Demands, Supplies and Needs – River Basin and
South Central Texas Region Summaries
................................................ 4-109

4-23                 Projected Water Demands, Supplies and Needs for Major
Water Providers
....................................................................................... 4-115

4-24                 Projected Water Needs by Water User Group and Impacts of
Not Meeting Water Needs upon Population
............................................. 4-120

4-25                 Projected Water Needs by Water User Group and Impacts of
Not Meeting Water Needs upon School Enrollment
................................. 4-128

4-26                 Projected Water Needs by Water User Group and Impacts of
Not Meeting Water Needs upon Gross Business
in Millions of 1999 Dollars
......................................................................... 4-136

4-27                 Projected Water Needs by Water User Group and Impacts of
Not Meeting Water Needs upon Employment
.......................................... 4-144

4-28                 Projected Water Needs by Water User Group and Impacts of
Not Meeting Water Needs upon Personal Income
.................................................................................................................         4-152

 
Section 5 Text

Section 5 Part 1 Text

Section 5 Part 2 Text

(Text linked to Figures 5.2-1 to 5.2-45 and Tables 5.1-1 to 5.4-13)
 

Section 5 - Figures 5.2-1 to 5.2-45
5.1-1               Planning Process
5.2-1               Regional  Water Plan – South Central Texas – Region L - Regional Water Planning Area

 5.2-2               Regional  Water Plan
 5.2-3               Regional Water Plan – Annual Cost of Cumulative Additional Water Supply

 5.2-4               Regional Water Plan – Unit Cost of Cumulative Additional Water Supply
 5.2-5               Regional Water Plan – Atascosa County: Graph and Table

 5.2-6               Regional Water Plan – Bexar County: Graph  and Table
 5.2-7               Regional Water Plan – Caldwell County:  Graph  and Table
 5.2-8               Regional Water Plan – Calhoun County: Graph  and Table

 5.2-9               Regional Water Plan – Comal County:  Graph  and Table
 5.2-10             Regional Water Plan – DeWitt County: Graph and Table

 5.2-11             Regional Water Plan – Dimmit County: Graph and Table

 5.2-12             Regional Water Plan – Frio County: Graph  and Table

 5.2-13             Regional Water Plan – Goliad County:  Graph and Table

 5.2-14             Regional Water Plan – Gonzales County:  Graph and Table
 5.2-15             Regional Water Plan – Guadalupe County:  Graph and Table

 5.2-16             Regional Water Plan – Hays County:  Graph and Table

 5.2-17             Regional Water Plan – Karnes County:  Graph and Table

 5.2-18             Regional Water Plan – Kendall County:  Graph and Table

 5.2-19             Regional Water Plan – La Salle County:  Graph and Table

 5.2-20             Regional Water Plan – Medina County:  Graph and Table

 5.2-21             Regional Water Plan – Refugio County:  Graph and Table

 5.2-22             Regional Water Plan – Uvalde County:  Graph and Table

 5.2-23             Regional Water Plan – Victoria County:  Graph  and Table

 5.2-24             Regional Water Plan – Wilson County:  Graph and Table   

 5.2-25             Regional Water Plan – Zavala County:  Graph  and Table

 5.2-26             Regional Water Plan – Simulated Comal Springs Discharge

 5.2-27             Regional Water Plan – Simulated San Marcos Springs Discharge

 5.2-28             Regional Water Plan – Simulated Edwards Aquifer Pumpage

 5.2-29             Regional  Water Plan – Simulated Edwards Aquifer Levels

 5.2-30             Regional  Water Plan – Additional Carrizo Groundwater Pumpage

 5.2-31             Regional Water Plan – Simulated Carrizo Aquifer Drawdown
 5.2-32             Regional Water Plan – Carrizo Aquifer
 5.2-33             Regional Water Plan – Carrizo Aquifer
 5.2-34             Regional Water Plan – Carrizo Aquifer
 5.2-35             Regional Water Plan – Carrizo Aquifer
 5.2-36             Regional Water Plan – Carrizo Aquifer
 5.2-37             Simsboro  Aquifer in CPS-ALCOA Area Drawdown between Years 2000 and 2050 for 55,000 acft/yr Water Supply.
 5.2-38             Regional Water Plan – Simsboro Aquifer
 5.2-39             Regional Water Plan – Simsboro Aquifer
 5.2-40             Regional Water Plan – Streamflow Comparisons
 5.2-41             Regional Water Plan – Streamflow Comparisons
 5.2-42             Regional Water Plan – Streamflow Comparisons
 5.2-43             Regional Water Plan – Streamflow Comparisons
 5.2-44             Omernick’s Ecoregions for the Regional Water Plan within Region L
 5.2-45             Gould’s Vegetational Areas for the Regional Water Plan within Region L

 

Section 5 - Tables 5.1-1 to 5.4-13

5.1-1               WaterSupply Option Summary Sorted by Unit Cost            5-5

5.2-1               WaterManagement Strategies, County Needs, and County
Allocation of New Supplies in 2050
          5-11

5.2-2               AtascosaCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-23

5.2-3               BexarCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-25

5.2-4               CaldwellCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-27

5.2-5               CalhounCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-29

5.2-6               ComalCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-31

5.2-7               DeWittCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-33

5.2-8               DimmitCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-35

5.2-9               FrioCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-37

5.2-10             GoliadCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-39

5.2-11             Gonzales County Summary ofProjected Water Needs (Shortages)
and Water Management Strategies
          5-41

5.2-12             GuadalupeCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-43

5.2-13             HaysCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-45

5.2-14             KarnesCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-47

5.2-15             KendallCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-49

5.2-16             LaSalle County Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-51

5.2-17             MedinaCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-53

5.2-18             RefugioCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-55

5.2-19             UvaldeCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-57

5.2-20             VictoriaCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-59

5.2-21             WilsonCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-61

5.2-22             ZavalaCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-63

5.2-23             CriteriaUsed by TPWD to Nominate Ecologically Unique River and
Stream Segments In and Adjacent to the Region L Planning Area
        5-115

5.2-24                            Construction or Operational Activities of Water Management
Strategies Potentially Affecting Ecologically Unique River and
Stream Segments
        5-116

5.2-25                            South Central Texas Regional Water Plan – TWDB Evaluation
Criteria Summary
        5-119

5.3.1-1            Atascosa County Surplus/Shortage - Tables 5.3.1-1 to 19        5-133

5.3.1-2            Recommended Water Supply Plan forthe City of Charlotte        5-134

5.3.1-3            Recommended Plan Costs by Decade forthe City of Charlotte        5-134

5.3.1-4            Recommended Water Supply Plan forthe City of Jourdanton        5-134

5.3.1-5            Recommended Plan Costs by Decade for the City of Jourdanton        5-135

5.3.1-6            Recommended Water Supply Plan forthe City of Lytle        5-135

5.3.1-7            Recommended Plan Costs by Decade for the City of Lytle        5-136

5.3.1-8            Recommended Water Supply Plan forthe City of Pleasanton        5-136

5.3.1-9            Recommended Plan Costs by Decade for the City of Pleasanton        5-137

5.3.1-10          Recommended Water Supply Plan for theCity of Poteet        5-137

5.3.1-11          Recommended Plan Costs by Decade for the City of Poteet        5-137

5.3.1-12          Recommended Water Supply Plan for Rural Areas        5-138

5.3.1-13          Recommended Plan Costs by Decade for Rural Areas        5-138

5.3.1-14          Recommended Water Supply Plan for Steam-Electric Power        5-139

5.3.1-15          Recommended Plan Costs by Decade forSteam-Electric Power        5-140

5.3.1-16          Recommended Water Supply Plan forMining        5-140

5.3.1-17          Recommended Plan Costs by Decade forMining        5-141

5.3.1-18          Recommended Water Supply Plan forIrrigation        5-141

5.3.1-19          Recommended Plan Costs by Decade forIrrigation        5-142

5.3.2-1            BexarCounty Surplus/Shortage        5-143

5.3.2-2            WaterManagement Strategies Considered for Bexar County        5-145

5.3.2-3            Recommended Water Supply Plan for the Regional
Water Provider(s) for Bexar County        5-147

5.3.2-4            Recommended Plan Costs by Decadefor the Regional Water
Provider(s) for Bexar County        5-148

5.3.2-5            Recommended Water Supply Plan for theCity of Alamo Heights        5-149

5.3.2-6            Recommended Plan Costs by Decadefor the City of Alamo Heights        5-149

5.3.2-7            Recommended Water Supply Plan for the City of Balcones Heights        5-150

5.3.2-8            Recommended Plan Costs by Decade for the
City of Balcones Heights        5-151

5.3.2-9            Recommended Water Supply Plan for the City of China Grove        5-151

5.3.2-10          Recommended Plan Costs by Decade for the City of China Grove        5-152

5.3.2-11          Recommended Water Supply Plan for the City of Converse        5-153

5.3.2-12          Recommended Plan Costs by Decade for the City of Converse        5-153

5.3.2-13          Recommended Water Supply Plan for the City of Elmendorf        5-154

5.3.2-14          Recommended Plan Costs by Decade for the City of Elmendorf        5-154

5.3.2-15          Recommended Water Supply Plan for the City of Fair Oaks Ranch        5-155

5.3.2-16          Recommended Plan Costs by Decade for the
City of Fair Oaks Ranch        5-156

5.3.2-17          Recommended Water Supply Plan for the City of Helotes        5-157

5.3.2-18          Recommended Plan Costs by Decade for the City of Helotes        5-157

5.3.2-19          Recommended Water Supply Plan for the City of Kirby        5-158

5.3.2-20          Recommended Plan Costs by Decade for the City of Kirby        5-158

5.3.2-21          Recommended Water Supply Plan for the City of Leon Valley        5-159

5.3.2-22          Recommended Plan Costs by Decade for the City of Leon Valley        5-159

5.3.2-23          Recommended Water Supply Plan for the
Live Oak Water Public Utility        5-160

5.3.2-24          Recommended Plan Costs by Decade forthe
Live Oak Water Public Utility        5-160

5.3.2-25          Recommended Water Supply Plan for the City of Olmos Park        5-161

5.3.2-26          Recommended Plan Costs by Decade for the City of Olmos Park        5-161

5.3.2-27          Recommended Water Supply Plan for the City of San Antonio        5-163

5.3.2-28          Recommended Plan Costs by Decade for the City of San Antonio        5-164

5.3.2-29          Recommended Water Supply Plan for Schertz (Outside City)        5-165

5.3.2-30          Recommended Plan Costs by Decade for Schertz (Outside City)        5-165

5.3.2-31          Recommended Water Supply Plan for the City of Shavano Park        5-166

5.3.2-32          Recommended Plan Costs by Decade for the City of Shavano Park        5-166

5.3.2-33          Recommended Water Supply Plan for the City of St Hedwig        5-167

5.3.2-34          Recommended Plan Costs by Decade for the City of St Hedwig        5-167

5.3.2-35          Recommended Water Supply Plan for the City of Terrell Hills        5-168

5.3.2-36          Recommended Plan Costs by Decade for the City of Terrell Hills        5-169

5.3.2-37          Recommended Water Supply Plan for the City of Universal City        5-169

5.3.2-38          Recommended Plan Costs by Decade for the City of Universal City        5-170

5.3.2-39          Recommended Water Supply Plan for Windcrest        5-170

5.3.2-40          Recommended Plan Costs by Decade for Windcrest        5-171

5.3.2-41          Recommended Water Supply Plan for BMWD (Castle Hills)        5-172

5.3.2-42          Recommended Plan Costs by Decade for BMWD (Castle Hills)        5-173

5.3.2-43          Recommended Water Supply Plan for BMWD (Somerset)        5-174

5.3.2-44          Recommended Plan Costs by Decade for BMWD (Somerset)        5-174

5.3.2-45          Recommended Water Supply Plan for BMWD (Hill Ctry/HollwPk)        5-176

5.3.2-46          Recommended Plan Costs by Decade for
BMWD (Hill Ctry/HollwPk)        5-177

5.3.2-47          Recommended Water Supply Plan for BMWD (Other Subdivisions)        5-179

5.3.2-48          Recommended Plan Costs by Decade for
BMWD (Other Subdivisions)        5-180

5.3.2-49          Recommended Water Supply Plan for Fort Sam Houston        5-181

5.3.2-50          Recommended Plan Costs by Decade for Fort Sam Houston        5-182

5.3.2-51          Recommended Water Supply Plan for Lackland AFB        5-182

5.3.2-52          Recommended Plan Costs by Decade for Lackland AFB        5-183

5.3.2-53          Recommended Water Supply Plan for Randolph AFB        5-184

5.3.2-54          Recommended Plan Costs by Decade for Randolph AFB        5-184

5.3.2-55          Recommended Water Supply Plan for Rural Areas        5-185

5.3.2-56          Recommended Plan Costs by Decade for Rural Areas        5-185

5.3.2-57          Recommended Water Supply Plan for Industrial        5-186

5.3.2-58          Recommended Plan Costs by Decade for Industrial        5-186

5.3.2-59          Recommended Water Supply Plan for Mining        5-187

5.3.2-60          Recommended Plan Costs by Decade for Mining        5-188

5.3.2-61          Recommended Water Supply Plan for Irrigation        5-188

5.3.2-62          Recommended Plan Costs by Decade for Irrigation        5-189

5.3.3-1            Caldwell County Surplus/Shortage        5-191

5.3.3-2            Recommended Water Supply Plan for the City of Lockhart        5-192

5.3.3-3            Recommended Plan Costs by Decade for the City of Lockhart        5-192

5.3.3-4            Recommended Water Supply Plan for the City of Luling        5-193

5.3.3-5            Recommended Plan Costs by Decadefor the City of Luling        5-193

5.3.3-6            Recommended Water Supply Plan for the City of Martindale        5-194

5.3.3-7            Recommended Plan Costs by Decade for the City of Martindale        5-194

5.3.4-1            CalhounCounty Surplus/Shortage        5-197

5.3.4-2            Recommended Water Supply Plan for the City of Point Comfort        5-198

5.3.4-3            Recommended Plan Costs by Decade for the City of Point Comfort        5-198

5.3.4-4            Recommended Water Supply Plan forthe City of Port Lavaca        5-199

5.3.4-5            Recommended Plan Costs by Decade for the City of Port Lavaca        5-199

5.3.4-6            Recommended Water Supply Plan forthe City of Seadrift        5-200

5.3.4-7            Recommended Plan Costs by Decade for the City of Seadrift        5-200

5.3.5-1            ComalCounty Surplus/Shortage        5-203

5.3.5-2            Recommended Water Supply Plan for the City of Garden Ridge        5-204

5.3.5-3            Recommended Plan Costs by Decade for the City of Garden Ridge        5-204

5.3.5-4            Recommended Water Supply Plan forthe City of New Braunfels        5-206

5.3.5-5            Recommended Plan Costs by Decade for the City of New Braunfels        5-207

5.3.5-6            Recommended Water Supply Plan for Rural Areas        5-208

5.3.5-7            Recommended Plan Costs by Decade for Rural Areas        5-209

5.3.5-8            Recommended Water Supply Plan for Industrial        5-210

5.3.5-9            Recommended Plan Costs by Decade for Industrial        5-210

5.3.5-10          Recommended Water Supply Plan forMining        5-211

5.3.5-11          Recommended Plan Costs by Decade forMining        5-211

5.3.6-1            DeWittCounty Surplus/Shortage        5-213

5.3.6-2            Recommended Water Supply Plan for the City of Cuero        5-214

5.3.6-3            Recommended Plan Costs by Decade for the City of Cuero        5-214

5.3.6-4            Recommended Water Supply Plan for the City of Yoakum        5-214

5.3.6-5            Recommended Plan Costs by Decadefor the City of Yoakum        5-215

5.3.6-6            Recommended Water Supply Plan for the City of Yorktown        5-215

5.3.6-7            Recommended Plan Costs by Decade for the City of Yorktown        5-215

5.3.7-1            DimmitCounty Surplus/Shortage        5-217

5.3.7-2            Recommended Water Supply Plan for the City of Big Wells        5-218

5.3.7-3            Recommended Plan Costs by Decade for the City of Big Wells        5-218

5.3.7-4            Recommended Water Supply Plan forthe City of Carrizo Springs        5-219

5.3.7-5            Recommended Plan Costs by Decade for the City of Carrizo Springs        5-219

5.3.8-1            FrioCounty Surplus/Shortage        5-221

5.3.8-2            Recommended Water Supply Plan for the City of Dilley        5-221

5.3.8-3            Recommended Plan Costs by Decade for the City of Dilley        5-222

5.3.8-4            Recommended Water Supply Plan for the City of Pearsall        5-222

5.3.8-5            Recommended Plan Costs by Decade for the City of Pearsall        5-222

5.3.8-6            Recommended Water Supply Plan for Irrigation        5-224

5.3.8-7            Recommended Plan Costs by Decade for Irrigation        5-224

5.3.9-1            GoliadCounty Surplus/Shortage        5-225

5.3.9-2            Recommended Water Supply Plan for the City of Goliad        5-226

5.3.9-3            Recommended Plan Costs by Decadefor the City of Goliad        5-226

5.3.10-1          Gonzales County Surplus/Shortage        5-229

5.3.10-2          Recommended Water Supply Plan for the City of Gonzales        5-230

5.3.10-3          Recommended Plan Costs by Decade for the City of Gonzales        5-230

5.3.10-4          Recommended Water Supply Plan for theCity of Nixon        5-230

5.3.10-5          Recommended Plan Costs by Decade for the City of Nixon        5-231

5.3.10-6          Recommended Water Supply Plan for the City of Waelder        5-231

5.3.10-7          Recommended Plan Costs by Decade for the City of Waelder        5-231

5.3.11-1          Guadalupe County Surplus/Shortage        5-233

5.3.11-2          Recommended Water Supply Plan for the City of Cibolo        5-234

5.3.11-3          Recommended Plan Costs by Decade for the City of Cibolo        5-234

5.3.11-4          Recommended Water Supply Plan for the City of Marion        5-235

5.3.11-5          Recommended Plan Costs by Decade for the City of Marion        5-235

5.3.11-6          Recommended Water Supply Plan for McQueeney        5-236

5.3.11-7          Recommended Plan Costs by Decade for McQueeney        5-236

5.3.11-8          Recommended Water Supply Plan for the City of Schertz        5-237

5.3.11-9          Recommended Plan Costs by Decade for the City of Schertz        5-237

5.3.11-10        Recommended Water Supply Plan for the City of Sequin        5-238

5.3.11-11        Recommended Plan Costs by Decade for the City of Sequin        5-238

5.3.11-12        Recommended Water Supply Plan for Rural Areas        5-239

5.3.11-13        Recommended Plan Costs by Decade for Rural Areas        5-240

5.3.11-14        Recommended Water Supply Plan for Industrial        5-241

5.3.11-15        Recommended Plan Costs by Decade for Industrial        5-241

5.3.11-16        Recommended Water Supply Plan forSteam-Electric Power        5-242

5.3.11-17        Recommended Plan Costs by Decade for Steam-Electric Power        5-242

5.3.11-18        Recommended Water Supply Plan for Mining        5-243

5.3.11-19        Recommended Plan Costs by Decade for Mining        5-243

5.3.12-1          Hays County Surplus/Shortage        5-245

5.3.12-2          Recommended Water Supply Plan for the City of Kyle        5-246

5.3.12-3          Recommended Plan Costs by Decade for the City of Kyle        5-247

5.3.12-4          Recommended Water Supply Plan for the City of San Marcos        5-248

5.3.12-5          Recommended Plan Costs by Decade for the City of San Marcos        5-249

5.3.12-6          Recommended Water Supply Plan for the City of Wimberley        5-250

5.3.12-7          Recommended Plan Costs by Decade forthe City of Wimberley        5-250

5.3.12-8          Recommended Water Supply Plan for the City of Woodcreek        5-251

5.3.12-9          Recommended Plan Costs by Decade forthe City of Woodcreek        5-251

5.3.12-10        Recommended Water Supply Plan for RuralAreas        5-252

5.3.12-11        Recommended Plan Costs by Decade for Rural Areas        5-253

5.3.12-12        Recommended Water Supply Plan for Mining        5-254

5.3.12-13        Recommended Plan Costs by Decade for Mining        5-254

5.3.13-1          KarnesCounty Surplus/Shortage        5-255

5.3.13-2          Recommended Water Supply Plan for the City of Karnes City        5-256

5.3.13-3          Recommended Plan Costs by Decade for the City of Karnes City        5-256

5.3.13-4          Recommended Water Supply Plan for the City of Kenedy        5-256

5.3.13-5          Recommended Plan Costs by Decade for the City of Kenedy        5-257

5.3.13-6          Recommended Water Supply Plan for the City of Runge        5-257

5.3.13-7          Recommended Plan Costs by Decade forthe City of Runge        5-257

5.3.14-1          Kendall County Surplus/Shortage        5-259

5.3.14-2          Recommended Water Supply Plan for the City of Boerne        5-260

5.3.14-3          Recommended Plan Costs by Decade for the City of Boerne        5-260

5.3.14-4          Recommended Water Supply Plan for theCity of Comfort        5-261

5.3.14-5          Recommended Plan Costs by Decade for the City of Comfort        5-261

5.3.14-6          Recommended Water Supply Plan forRural Areas        5-262

5.3.14-7          Recommended Plan Costs by Decade for Rural Areas        5-262

5.3.14-8          Recommended Water Supply Plan for Industrial        5-263

5.3.14-9          Recommended Plan Costs by Decade for Industrial        5-263

5.3.15-1          LaSalleCounty Surplus/Shortage        5-265

5.3.15-2          Recommended Water Supply Plan for the City of Cotulla        5-266

5.3.15-3          Recommended Plan costs by Decade for the City of Cotulla        5-266

5.3.15-4          Recommended Water Supply Plan for the City of Encinal        5-266

5.3.15-5          Recommended Plan Costs by Decade for the City of Encinal        5-267

5.3.16-1          Medina County Surplus/Shortage        5-269

5.3.16-2          Recommended Water Supply Plan for the City of Castroville        5-270

5.3.16-3          Recommended Plan Costs by Decade for the City of Castroville        5-270

5.3.16-4          Recommended Water Supply Plan for the City of Devine        5-271

5.3.16-5          Recommended Plan Costs by Decade for the City of Devine        5-271

5.3.16-6          Recommended Water Supply Plan for the City of Hondo        5-272

5.3.16-7          Recommended Plan Costs by Decade for the City of Hondo        5-272

5.3.16-8          Recommended Water Supply Plan for the City of La Coste        5-273

5.3.16-9          Recommended Plan Costs by Decade forthe City of La Coste        5-274

5.3.16-10        Recommended Water Supply Plan for the City of Natalia        5-274

5.3.16-11        Recommended Plan Costs by Decade for the City of Natalia        5-275

5.3.16-12        Recommended Water Supply Plan for Rural Areas        5-275

5.3.16-13        Recommended Plan Costs by Decade forRural Areas        5-276

5.3.16-14        Recommended Water Supply Plan for Mining        5-276

5.3.16-15        Recommended Plan Costs by Decade for Mining        5-277

5.3.16-16        Recommended Water Supply Plan for Irrigation        5-278

5.3.16-17        Recommended Plan Costs by Decade for Irrigation        5-278

5.3.17-1          RefugioCounty Surplus/Shortage        5-279

5.3.17-2          Recommended Water Supply Plan for the City of Refugio        5-280

5.3.17-3          Recommended Plan Costs by Decade for the City of Refugio        5-280

5.3.17-4          Recommended Water Supply Plan for the City of Woodsboro        5-280

5.3.17-5          Recommended Plan Costs by Decade for the City of Woodsboro        5-281

5.3.18-1          Uvalde County Surplus/Shortage        5-283

5.3.18-2          Recommended Water Supply Plan for the City of Sabinal        5-284

5.3.18-3          Recommended Plan Costs by Decade for the City of Sabinal        5-284

5.3.18-4          Recommended Water Supply Plan for the City of Uvalde        5-285

5.3.18-5          Recommended Plan Costs by Decade for the City of Uvalde        5-286

5.3.18-6          Recommended Water Supply Plan for Irrigation        5-287

5.3.18-7          Recommended Plan Costs by Decade for Irrigation        5-287

5.3.19-1          VictoriaCounty Surplus/Shortage        5-289

5.3.19-2          Recommended Water Supply Plan for the City of Bloomington        5-290

5.3.19-3          Recommended Plan Costs by Decade forthe City of Bloomington        5-290

5.3.19-4          Recommended Water Supply Plan for the City of Victoria        5-291

5.3.19-5          Recommended Plan Costs by Decade for the City of Victoria        5-291

5.3.20-1          Wilson County Surplus/Shortage        5-293

5.3.20-2          Recommended Water Supply Plan for theCity of Floresville        5-294

5.3.20-3          Recommended Plan Costs by Decade for the City of Floresville        5-294

5.3.20-4          Recommended Water Supply Plan for the City of La Vernia        5-295

5.3.20-5          Recommended Plan Costs by Decade for the City of La Vernia        5-295

5.3.20-6          Recommended Water Supply Plan for the City of Poth        5-296

5.3.20-7          Recommended Plan Costs by Decade for the City of Poth        5-296

5.3.20-8          Recommended Water Supply Plan for the City of Stockdale        5-296

5.3.20-9          Recommended Plan Costs by Decade for the City of Stockdale        5-297

5.3.21-1          ZavalaCounty Surplus/Shortage        5-299

5.3.21-2          Recommended Water Supply Plan for the City of Batesville        5-300

5.3.21-3          Recommended Plan Costs by Decade for the City of Batesville        5-300

5.3.21-4          Recommended Water Supply Plan for the City of Crystal City        5-300

5.3.21-5          Recommended Plan Costs by Decade for the City of Crystal City        5-301

5.3.21-6          Recommended Water Supply Plan for the City of La Pryor        5-301

5.3.21-7          Recommended Plan Costs by Decade for the City of La Pryor        5-302

5.3.21-8          Recommended Water Supply Plan for Irrigation        5-303

5.3.21-9          Recommended Plan Costs by Decade for Irrigation        5-303

5.4-1               MajorWater Provider Surplus/Shortage        5-305

5.4-2               Recommended Water Supply Plan for the
Regional Water Provider(s) for Bexar County        5-307

5.4-3               Recommended Plan Costs by Decade for the
Regional Water Provider(s) for Bexar County        5-308

5.4-4               Recommended Water Supply Plan for SAWS        5-310

5.4-5               Recommended Plan Costs by Decade for SAWS        5-311

5.4-6               Recommended Water Supply Plan for BMWD        5-314

5.4-7               Recommended Plan Costs by Decade for BMWD        5-315

5.4-8               Recommended Water Supply Plan for CRWA        5-316

5.4-9               Recommended Plan Costs by Decade for CRWA        5-317

5.4-10             Recommended Water Supply Plan for NBU        5-319

5.4-11             Recommended Plan Costs by Decade for NBU        5-319

5.4-12             Recommended Water Supply Plan for the City of San Marcos        5-321

5.4-13             Recommended Plan Costs by Decade for the City of San Marcos        5-321

 

Section 6

Section 6 Text

(Section 6 linked to Supplements 1 and 2)

 

Supplement 1 Text

(Supplement 1 Text linked to Figure 1, Table A and  Table B   Table B cont.)

Supplement 2

Figure 1          Economic Feasibility of Meeting Projected Irrigation Water Needs

Table A           Projected Irrigation Water Needs - South Central Texas Region

Table B          Estimates of Income from Irrigation to Produce Crops    Table B Cont.

 

 

Section  7

Section 7 Text

(Text linked to Graph 1 and Table 7-1)

Graph I           Criteria Survey Results

Table 7.1        Comment Categories and Number Received per Category

 

 

Appendices

                          

Appendix A  - Irrigation Projection Methods

Appendix B – Technical Evaluation Assumptions

Appendix C – Reliability for Water Rights

Supplement to Vol. I - Conservation Planning Guidelines

 

    Top   

 



Overview | Counties | Aquifers | Rivers | Entities | About the Plan | Keywords | Files | For Users

 Table of Contents | Text | Figures  | Tables | Table of Contents by Section | Search


© 2001 C. Thomas Koch. All rights reserved.