Table of Contents

Cover Pages  

Search for any word in text files

Figures in Executive Summary and Sections 1 to 7 in this page

Tables in Executive Summary and Sections 1 to 7 in this page

Figures Links only

Tables Links only

Text Links only, with access to Figures and Tables in Sections 1 to 7

Table of Contents by Section: Text, Figures and Tables Links

Overview | Counties | Aquifers | Rivers | Entities | About the Plan | Keywords | Files | For Users

 

Section                                                                                                                                      Page

Executive Summary - text linked to Figures and Tables.....................................................          ES-1

     1                 Description of South Central Texas Region  (with Section 1.1 to 1.6) Text linked to Figures and Tables..................................................................................................... 1-1

1.1       Background............................................................................................             1-1

1.2       Physical Description of the South Central Texas Region..................             1-2

1.2.1....... Climate...................................................................................             1-2

1.2.2....... General Geology...................................................................             1-5

1.2.3....... Vegetational Areas...............................................................             1-5

1.2.4....... Natural Resources.................................................................             1-9

1.2.5....... Major Water Demand Centers..........................................           1-11

1.3       Population and Demography..............................................................           1-13

1.3.1....... Historical and Recent Trends in Population.....................           1-13

1.3.2....... Demographic Characteristics...........................................           1-15

1.4       Economy – Major Sectors and Industries.........................................           1-18

1.4.1....... Summary of the South Central Texas Regional
Economy..............................................................................           1-18

1.4.2....... Agricultural Production.......................................................           1-18

1.4.3....... Livestock Production..........................................................           1-20

1.4.4....... Mining...................................................................................           1-22

1.4.5....... Manufacturing......................................................................           1-22

1.4.6....... Trades and Services..........................................................           1-24

1.5       Water Uses...........................................................................................           1-24

1.6       Major Municipal and Manufacturing Water Providers......................           1-27

1.6.1....... San Antonio Water System................................................           1-27

1.6.2....... Bexar Metropolitan Water District.....................................           1-28

1.6.3....... Canyon Regional Water Authority.....................................           1-28

1.6.4....... Guadalupe-Blanco River Authority....................................           1-28

1.6.5....... New Braunfels Utilities........................................................           1-29

1.6.6....... City of San Marcos.............................................................           1-29

1.7       Water Supplies (with Section 1.8).....................................................           1-29

1.7.1....... Groundwater........................................................................           1-29

1.7.2....... Surface Water.....................................................................           1-38

1.7.3....... Existing Surface Water Resources, Including
Major Springs......................................................................           1-41

1.8       Water Quality........................................................................................           1-47

1.8.1....... Groundwater Quality...........................................................           1-47

1.8.2....... Surface Water Quality.........................................................           1-50

1.9       Threats to Agricultural and Natural Resources (with Section 1.10.3) 1-51

1.10    Summary of Existing Plans and Programs.......................................           1-52

1.10.1..... State and Federal Plans/Programs..................................           1-53

1.10.2..... Regional Water Plans.........................................................           1-63

1.10.3..... Certified Groundwater Conservation District
Management Plans.............................................................           1-69

1.10.4..... Local Water Plans...............................................................           1-74

1.10.5..... Water Conservation and Drought Contingency Plans
(with Section 1.12)..............................................................           1-90

1.10.6..... Water Quality Programs...................................................         1-102

1.10.7..... Summary of Other Information Available from
Existing Local/Regional Planning...................................         1-104

1.11    Water Availability Requirements Promulgated by a County
Commissioners Court.......................................................................         1-105

1.12    Current Preparations for Drought....................................................         1-105

     2                 Population and Water Demand Projections - Text linked to Figures and Tables                      2-1

2.1       Population Projections..............................................................             2-1

2.2       Municipal Water Demand Projections...............................................           2-12

2.3       Industrial Water Demand Projections................................................           2-15

2.4       Steam-Electric Power Water Demand Projections.........................           2-15

2.5       Mining Water Demand Projections....................................................           2-16

2.6       Irrigation Water Demand Projections................................................           2-21

2.7       Livestock Water Demand Projections...............................................           2-24

2.8       Total Water Demand Projections.......................................................           2-27

2.9       Water Demand Projections for Counties and Parts of
Counties of River and Coastal Basins of the South
Central Texas Region..........................................................................           2-30

2.10    Water Demand Projections for Major Water Providers
in the South Central Texas Region ...................................................           2-48

2.10.1..... San Antonio Water System (SAWS)................................           2-51

2.10.2..... Bexar Metropolitan Water District (BMWD).....................           2-51

2.10.3..... Canyon Regional Water Authority (CRWA).....................           2-59

2.10.4..... Guadalupe-Blanco River Authority (GBRA).....................           2-59

2.10.5..... New Braunfels Utilities (NBU)............................................           2-61

2.10.6..... City of San Marcos.............................................................           2-61

     3                 Evaluation of Current Water Supplies - Text linked to Figures and Tables                    3-1

3.1       Groundwater...........................................................................................             3-1

3.1.1....... Edwards-Balcones Fault Zone Aquifer
(Edwards Aquifer).................................................................             3-1

3.1.2....... Carrizo-Wilcox Aquifer (Carrizo Aquifer)............................             3-1

3.1.3....... Trinity Aquifer.........................................................................             3-2

3.1.4....... Gulf Coast Aquifer.................................................................             3-2

3.1.5....... Edwards-Trinity (Plateau) Aquifer.......................................             3-3

3.1.6....... Sparta Aquifer.......................................................................             3-3

3.1.7....... Queen City Aquifer................................................................             3-3

3.1.8....... Groundwater Availability in the South Central

................ Texas Region.........................................................................             3-4

3.2       Surface Water........................................................................................             3-6

3.2.1....... Lakes and Reservoirs...........................................................             3-7

3.2.2....... Run-of-River Water Rights....................................................             3-9

3.3       Drought Response...............................................................................           3-11

3.4       Methodology to Calculate the Water Supplies Available
to the South Central Texas Region and Methodology for
Calculating the Water Supplies Available for Water
User Groups.........................................................................................           3-14

3.5       Potential for Emergency Transfers of Surface Water......................           3-18

     4                 Comparison of Supply and Demand to Determine Needs - Text linked to Tables                   4-1

4.1       Water Needs Projections by Water User Group................................             4-1

4.2       Water Needs Projections by Major Water Provider......................         4-114

4.3       Social and Economic Impacts of Not Meeting
Projected Water Needs....................................................................         4-116

     5                 Regional, County, City, Water User Group, and
Major Provider Plans  -
Section 5 Part 1 Text   Section 5 Part 2 Text .............             5-1

5.1       Regional Water Planning Process -Section 5 Part 1.........................             5-1

5.1.1....... Water Supply Options...........................................................             5-2

5.1.2....... Alternative Regional Water Plans........................................             5-3

5.2       South Central Texas Regional Water Plan..........................................             5-7

5.2.1....... Regional Summaries............................................................             5-7

5.2.2....... County Summaries.............................................................           5-21

5.2.3....... Water Management Strategies.........................................           5-65

5.2.4....... Cumulative Effects - Section 5 - Part 2.............................           5-81

5.2.5....... Environmental Assessment.............................................         5-103

5.2.6....... Implementation Issues......................................................         5-118

5.2.7....... Special Water Resources................................................         5-127

5.3       Water User Group Plans and Costs - Section 5 - Part 3..............         5-129

5.3.1....... Atascosa County Water Supply Plan..............................         5-133

5.3.2....... Bexar County Water Supply Plan....................................         5-143

5.3.3....... Caldwell County Water Supply Plan...............................         5-191

5.3.4....... Calhoun County Water Supply Plan................................         5-197

5.3.5....... Comal County Water Supply Plan...................................         5-203

5.3.6....... DeWitt County Water Supply Plan..................................         5-213

5.3.7....... Dimmit County Water Supply Plan..................................         5-217

5.3.8....... Frio County Water Supply Plan.......................................         5-221

5.3.9....... Goliad County Water Supply Plan...................................         5-225

5.3.10..... Gonzales County Water Supply Plan..............................         5-229

5.3.11..... Guadalupe County Water Supply Plan...........................         5-233

5.3.12..... Hays County Water Supply Plan.....................................         5-245

5.3.13..... Karnes County Water Supply Plan..................................         5-255

5.3.14..... Kendall County Water Supply Plan.................................         5-259

5.3.15..... LaSalle County Water Supply Plan.................................         5-265

5.3.16..... Medina County Water Supply Plan.................................         5-269

5.3.17..... Refugio County Water Supply Plan.................................         5-279

5.3.18..... Uvalde County Water Supply Plan..................................         5-283

5.3.19..... Victoria County Water Supply Plan.................................         5-289

5.3.20..... Wilson County Water Supply Plan..................................         5-293

5.3.21..... Zavala County Water Supply Plan...................................         5-299

5.4       Water Supply Plans for Major Water Providers.............................         5-305

5.4.1....... Regional Water Provider(s) for Bexar County...............         5-305

5.4.2....... San Antonio Water System (SAWS)..............................         5-309

5.4.3....... Bexar Metropolitan Water District (BMWD)..................         5-312

5.4.4....... Canyon Regional Water Authority (CRWA)...................         5-316

5.4.5....... Guadalupe-Blanco River Authority (GBRA)...................         5-317

5.4.6....... New Braunfels Utilities (NBU)..........................................         5-318

5.4.7....... City of San Marcos...........................................................         5-320

     6                 Policies and Recommendations......................................................................             6-1

6.1       Introduction..............................................................................................             6-1

6.2       Additional Regional Water Plan Recommendations.........................             6-1

6.2.1....... Additional Regional Water Supply Storage.......................             6-1

6.2.2....... Lockhart Reservoir................................................................             6-2

6.3       Guiding Principles and Assumptions...................................................             6-2

6.3.1....... Regional Balance of Benefits and Costs —
Mitigation Policy....................................................................             6-2

6.3.2....... Conservation..........................................................................             6-3

6.3.3....... Use of Evaluation Criteria....................................................             6-3

6.3.4....... Potential Reductions in Permitted
Groundwater Supply..............................................................             6-3

6.3.5....... Groundwater Sustainability..................................................             6-4

6.3.6....... Protection of Edwards Aquifer Springflow
and Downstream Water Rights............................................             6-4

6.3.7....... Planning for System Management
Water Supplies......................................................................             6-4

6.4       Feasibility of Meeting Irrigation Water Needs....................................             6-5

6.5       Evaluation Criteria.................................................................................             6-5

6.6       Conservation Planning Guidelines.......................................................             6-7

6.7       Legislative Recommendations.............................................................             6-7

6.7.1....... Plan Implementation..............................................................             6-7

6.7.2....... Changes in TWDB Planning Process..............................           6-11

6.7.3....... Proposals for Other Legislative Changes........................           6-13

6.7.4....... Ecologically Unique Stream Segments and
Unique Reservoir Sites......................................................           6-14

Supplement 1 Text

Supplement 2

     7                 Regional Water Plan Adoption.........................................................................             7-1

7.1       Facilitation..............................................................................................             7-1

7.1.1....... Overview.................................................................................             7-1

7.1.2....... Initial Workshop.....................................................................             7-1

7.1.3....... Interviews................................................................................             7-2

7.1.4....... Facilitation..............................................................................             7-2

7.1.5....... Development of Alternatives................................................             7-3

7.1.6....... Selection of Initially Prepared Plan......................................             7-4

7.2       Public Participation................................................................................             7-6

7.2.1....... Introduction.............................................................................             7-6

7.2.2....... Phase I Public Participation.................................................             7-6

7.2.3....... Phase II Public Participation................................................             7-7

7.2.4....... Phase III Public Participation...............................................             7-8

7.3       Coordination with Other Regions.....................................................         7-109

7.4       Final Plan Adoption...........................................................................         7-110

Appendices

Appendix A – Irrigation Projection Methodology

Appendix B – General Procedures and Assumptions for Technical Evaluations

Appendix C – Reliability Information for Water Rights in the South Central Texas Region

 

Supplement to Vol. I - Conservation Planning Guidelines

 


List of Figures

Figure                                                                                                                                        Page

ES-1               South Central Texas Planning Region (Region L)......................................          ES-3

ES-2               Plan Structure..................................................................................................          ES-4

ES-3               Projected Water Demands..........................................................................        ES-12

ES-4               Distribution of Total Demand Among Users..............................................        ES-14

ES-5               Supply, Demand, and Need (Shortage).....................................................        ES-16

ES-6               Projected Water Needs (Shortages)..........................................................        ES-17

ES-7               Counties with Projected Municipal Needs (Shortages)...........................        ES-18

ES-8               Cities with Projected Needs (Shortages)..................................................        ES-18

ES-9               Counties with Projected Industrial Needs (Shortages).............................        ES-19

ES-10             Counties with Projected Steam-Electric Needs (Shortages)..................        ES-19

ES-11             Counties with Projected Irrigation Needs (Shortages).............................        ES-20

ES-12             Counties with Projected Mining Needs (Shortages)................................        ES-20

ES-13             Regional Planning Process.........................................................................        ES-22

ES-14             Sources of New Supply................................................................................        ES-23

ES-15             Phased Implementation of Water Management Strategies.............        ES-23

ES-16             Regional Water Plan — Annual Cost of Cumulative
Additional Water Supply
..............................................................................        ES-29

ES-17             Regional Water Plan — Unit Cost of Cumulative
Additional Water Supply
..............................................................................        ES-30

  1-1                 Eco-Regions — South Central Texas Region................................................             1-6

  1-2                 Percentages of Population Residing in Urban and Rural
Areas
(1990)....................................................................................................           1-15

  1-3                 Age Distribution of the Population (1990).....................................................           1-17

  1-4                 Level of Educational Achievement (1990)....................................................           1-17

  1-5                 Major Aquifers..................................................................................................           1-30

  1-6                 River Basins, Coastal Basins, Reservoirs, and Lakes................................           1-39

  2-1                 Summary of South Central Texas Region’s Projected Population...............             2-4

  2-2                 Projected Per Capita Water Use and Municipal Water Demand..............           2-14

  2-3                 Projections of Industrial, Steam-Electric, and Mining
Water Demands
...............................................................................................           2-20

  2-4                 Projections of Irrigation Water Demands......................................................           2-23

  2-5                 Projections of Livestock Water Demands....................................................           2-26

  2-6                 Total Water Demand Projections...................................................................           2-29

  3-1                 Major Aquifers – South Central Texas Region...............................................             3-2

  3-2                 River Basins, Coastal Basins, Reservoirs, and Lakes
(South Central Texas Region)
..........................................................................             3-6

5.1-1               Planning Process...............................................................................................             5-1

5.2-1               Regional Water Plan – South Central Texas – Region L
Regional Water Planning Area
.........................................................................             5-9

5.2-2               Regional Water Plan.......................................................................................           5-16

5.2-3               Regional Water Plan – Annual Cost of Cumulative
Additional Water Supply
.................................................................................           5-18

5.2-4                              Regional Water Plan – Unit Cost of Cumulative
Additional Water Supply
.................................................................................           5-19

5.2-5                              Regional Water Plan – Atascosa County......................................................           5-22

5.2-6                              Regional Water Plan – Bexar County............................................................           5-24

5.2-7                              Regional Water Plan – Caldwell County.......................................................           5-26

5.2-8                              Regional Water Plan – Calhoun County........................................................           5-28

5.2-9                              Regional Water Plan – Comal County...........................................................           5-30

5.2-10                          Regional Water Plan – DeWitt County..........................................................           5-32

5.2-11                          Regional Water Plan – Dimmit County..........................................................           5-34

5.2-12                          Regional Water Plan – Frio County...............................................................           5-36

5.2-13                          Regional Water Plan – Goliad County...........................................................           5-38

5.2-14                          Regional Water Plan – Gonzales County......................................................           5-40

5.2-15                          Regional Water Plan – Guadalupe County...................................................           5-42

5.2-16                          Regional Water Plan – Hays County.............................................................           5-44

5.2-17                          Regional Water Plan – Karnes County..........................................................           5-46

5.2-18                          Regional Water Plan – Kendall County.........................................................           5-48

5.2-19                          Regional Water Plan – La Salle County........................................................           5-50

5.2-20                          Regional Water Plan – Medina County.........................................................           5-52

5.2-21                          Regional Water Plan – Refugio County.........................................................           5-54

5.2-22                          Regional Water Plan – Uvalde County..........................................................           5-56

5.2-23                          Regional Water Plan – Victoria County.........................................................           5-58

5.2-24                          Regional Water Plan – Wilson County..........................................................           5-60

5.2-25                          Regional Water Plan – Zavala County...........................................................           5-62

5.2-26                          Regional Water Plan – Simulated Comal Springs Discharge....................           5-82

5.2-27                          Regional Water Plan – Simulated San Marcos Springs Discharge..........           5-83

5.2-28                          Regional Water Plan – Simulated Edwards Aquifer Pumpage..................           5-84

5.2-29                          Regional Water Plan – Simulated Edwards Aquifer Levels.......................           5-85

5.2-30                          Regional Water Plan – Additional Carrizo Groundwater Pumpage...........           5-87

5.2-31                          Regional Water Plan – Simulated Carrizo Aquifer Drawdown...................           5-88

5.2-32                          Regional Water Plan – Carrizo Aquifer.........................................................           5-89

5.2-33                          Regional Water Plan – Carrizo Aquifer.........................................................           5-90

5.2-34                          Regional Water Plan – Carrizo Aquifer.........................................................           5-91

5.2-35                          Regional Water Plan – Carrizo Aquifer.........................................................           5-92

5.2-36                          Regional Water Plan – Carrizo Aquifer.........................................................           5-93

5.2-37                          Simsboro Aquifer in CPS-ALCOA Area Drawdown between
Years 2000 and 2050 for 55,000 acft/yr Water Supply
...............................           5-94

5.2-38                          Regional Water Plan – Simsboro Aquifer.....................................................           5-95

5.2-39                          Regional Water Plan – Simsboro Aquifer.....................................................           5-96

5.2-40                          Regional Water Plan – Streamflow Comparisons.......................................           5-97

5.2-41                          Regional Water Plan – Streamflow Comparisons.......................................           5-98

5.2-42                          Regional Water Plan – Streamflow Comparisons.....................................         5-100

5.2-43                          Regional Water Plan – Streamflow Comparisons.....................................         5-101

5.2-44                          Omernick’s Ecoregions for the Regional
Water Plan within Region L
..........................................................................         5-105

5.2-45                          Gould’s Vegetational Areas for the Regional
Water Plan within Region L
..........................................................................         5-106

 

Figure 1          Economic Feasibility of Meeting Projected Irrigation Water Needs (Section 6, Supplement 1)


Graph I           Criteria Survey Results (Section 7)

List of Tables

Table                                                                                                                                         Page

ES-1               South Central Texas Regional Water Planning Group Members..............          ES-2

ES-2               Major Water Providers and Service Areas................................................        ES-15

ES-3               Regional Water Supply Plan Summary................................................        ES-23

  1-1                 South Central Texas Region – List of Counties (Location by
River Basin and Edwards Aquifer Area)
.........................................................             1-3

  1-2                 Climatological Data for South Central Texas Region....................................             1-4

  1-3                 Agricultural Resources — 1997.....................................................................           1-12

  1-4                 Population Growth – 1950 to 1998................................................................           1-14

  1-5                 Major Cities in the South Central Texas Region..........................................           1-15

  1-6                 County Population and Area.................................................................           1-16

  1-7                 Summary of Farm Production Data - 1997...................................................           1-19

  1-8                 Summary of Livestock Production Data - 1997...........................................           1-21

  1-9                 Summary of Manufacturing Activity - 1992....................................................           1-23

1-10                Trades and Services Industry - 1992.............................................................           1-25

1-11                Groundwater Availability by Aquifer...............................................................           1-38

1-12                List of Major Reservoirs..................................................................................           1-43

1-13                Summary of Run-of-River Water Rights........................................................           1-45

1-14                Summary of Plans/Studies Submitted to the SCTRWPG  1  2  3  4  5                           1-54

  2-1                 South Central Texas Region – List of Counties (Location by
River or Coastal Basin and Edwards Aquifer Area)
......................................             2-2

  2-2                 Population Projections (Individual Counties with River and
Coastal Basin Summaries)
...............................................................................             2-3

  2-3                 Population Projections (River and Coastal Basins, Counties,
and Cities)
..........................................................................................................             2-5

  2-4                 Municipal Water Demand Projections (Individual Counties
with River Basin Summaries)
.........................................................................           2-13

  2-5                 Industrial Water Demand Projections (Individual Counties
with River Basin Summaries)
.........................................................................           2-17

  2-6                 Steam-Electric Power Water Demand Projections (Individual
Counties with River Basin Summaries)
.........................................................           2-18

  2-7                 Mining Water Demand Projections (Individual Counties with
River Basin Summaries)
.................................................................................           2-19

  2-8                 Irrigation Water Demand Projections  (Individual Counties
with River Basin Summaries)
.........................................................................           2-22

  2-9                 Livestock Water Demand Projections (Individual Counties
with River Basin Summaries)
.........................................................................           2-25

2-10                Total Water Demand Projections  (Individual Counties with
River Basin Summaries)
.................................................................................           2-28

2-11                Composition of Total Water Use....................................................................           2-29

2-12                Water Demand Projections –  (River, Basins,
Counties, and Cities)
.......................................................................................           2-32

2-13                Water Demand Projections for Major Water Providers...............................           2-52

  3-1                 Groundwater Availability by Aquifer.................................................................             3-5

  3-2                 List of Major Reservoirs....................................................................................             3-8

  3-3                 Summary of Run-of-River Water Rights........................................................           3-10

  3-4                 Identification and Initiation of Drought Responses.......................................           3-12

  3-5                 Summary of Draft Edwards Aquifer Authority Critical Period
Management Rules
..........................................................................................           3-13

  4-1                 Projected Water Demands, Supplies, and Needs – Atascosa County        4-3

  4-2                 Projected Water Demands, Supplies and Needs – Bexar County..............             4-8

  4-3                 Projected Water Demands, Supplies and Needs – Caldwell County         4-14

  4-4                 Projected Water Demands, Supplies and Needs – Calhoun County         4-19

  4-5                 Projected Water Demands, Supplies, and Needs – Comal County..........           4-25

  4-6                 Projected Water Demands, Supplies and Needs – DeWitt County..........           4-30

  4-7                 Projected Water Demands, Supplies, and Needs – Dimmit County          4-37

  4-8                 Projected Water Demands, Supplies and Needs – Frio County...............           4-42

  4-9                 Projected Water Demands, Supplies, and Needs – Goliad County..........           4-46

4-10                Projected Water Demands, Supplies and Needs – Gonzales County       4-51

4-11                Projected Water Demands, Supplies, and Needs – Guadalupe County   4-56

4-12                Projected Water Demands, Supplies and Needs – Hays County (part)    4-61

4-13                Projected Water Demands, Supplies, and Needs – Karnes County          4-65

4-14                Projected Water Demands, Supplies and Needs – Kendall County......... 4-72

 4-15               Projected Water Demands, Supplies, and Needs – LaSalle
County
...............................................................................................................           4-78

4-16                Projected Water Demands, Supplies and Needs – Medina County......... 4-81

4-17                Projected Water Demands, Supplies, and Needs – Refugio County         4-86

4-18                Projected Water Demands, Supplies and Needs – Uvalde County..........           4-90

4-19                Projected Water Demands, Supplies, and Needs – Victoria County         4-93

4-20                Projected Water Demands, Supplies and Needs – Wilson County........         4-100

4-21                Projected Water Demands, Supplies, and Needs – Zavala County........         4-106

4-22                Projected Water Demands, Supplies and Needs – River Basin and
South Central Texas Region Summaries
...................................................         4-109

4-23                Projected Water Demands, Supplies and Needs for Major
Water Providers
.............................................................................................         4-115

4-24                Projected Water Needs by Water User Group and Impacts of
Not Meeting Water Needs upon Population
...............................................         4-120

 

4-25                Projected Water Needs by Water User Group and Impacts of
Not Meeting Water Needs upon School Enrollment
..................................         4-128

4-26                Projected Water Needs by Water User Group and Impacts of
Not Meeting Water Needs upon Gross Business
in Millions of 1999 Dollars
............................................................................         4-136

4-27                Projected Water Needs by Water User Group and Impacts of
Not Meeting Water Needs upon Employment
............................................         4-144

4-28                Projected Water Needs by Water User Group and Impacts of
Not Meeting Water Needs upon Personal Income
.............................         4-152

51-1               WaterSupply Option Summary Sorted by Unit Cost           5-5

52-1               WaterManagement Strategies, County Needs, and County
Allocation of New Supplies in 2050
          5-11

52-2               AtascosaCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-23

52-3               BexarCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-25

52-4               CaldwellCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-27

52-5               CalhounCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-29

52-6               ComalCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-31

52-7               DeWittCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-33

52-8               DimmitCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-35

52-9               FrioCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-37

52-10             GoliadCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-39

52-11             Gonzales County Summary ofProjected Water Needs (Shortages)
and Water Management Strategies
          5-41

52-12             GuadalupeCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-43

52-13             HaysCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-45

52-14             KarnesCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-47

52-15             KendallCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-49

52-16             LaSalle County Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-51

52-17             MedinaCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-53

52-18             RefugioCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-55

52-19             UvaldeCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-57

52-20             VictoriaCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-59

52-21             WilsonCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-61

52-22             ZavalaCounty Summary of Projected Water Needs (Shortages)
and Water Management Strategies
          5-63

52-23             CriteriaUsed by TPWD to Nominate Ecologically Unique River and
Stream Segments In and Adjacent to the Region L Planning Area
        5-115

5.2-24                          Construction or Operational Activities of Water Management
Strategies Potentially Affecting Ecologically Unique River and
Stream Segments
        5-116

5.2-25                          South Central Texas Regional Water Plan – TWDB Evaluation
Criteria Summary
        5-119

531-1            Atascosa County Surplus/Shortage - Tables 531-1 to 19        5-133

531-2            Recommended Water Supply Plan forthe City of Charlotte        5-134

531-3            Recommended Plan Costs by Decade forthe City of Charlotte        5-134

531-4            Recommended Water Supply Plan forthe City of Jourdanton        5-134

531-5            Recommended Plan Costs by Decade for the City of Jourdanton        5-135

531-6            Recommended Water Supply Plan forthe City of Lytle        5-135

531-7            Recommended Plan Costs by Decade for the City of Lytle        5-136

531-8            Recommended Water Supply Plan forthe City of Pleasanton        5-136

531-9            Recommended Plan Costs by Decade for the City of Pleasanton        5-137

531-10          Recommended Water Supply Plan for theCity of Poteet        5-137

531-11          Recommended Plan Costs by Decade for the City of Poteet        5-137

531-12          Recommended Water Supply Plan for Rural Areas        5-138

531-13          Recommended Plan Costs by Decade for Rural Areas        5-138

531-14          Recommended Water Supply Plan for Steam-Electric Power        5-139

531-15          Recommended Plan Costs by Decade forSteam-Electric Power        5-140

531-16          Recommended Water Supply Plan forMining        5-140

531-17          Recommended Plan Costs by Decade forMining        5-141

531-18          Recommended Water Supply Plan forIrrigation        5-141

531-19          Recommended Plan Costs by Decade forIrrigation        5-142

532-1            BexarCounty Surplus/Shortage        5-143

532-2            WaterManagement Strategies Considered for Bexar County        5-145

532-3            Recommended Water Supply Plan for the Regional
Water Provider(s) for Bexar County        5-147

532-4            Recommended Plan Costs by Decadefor the Regional Water
Provider(s) for Bexar County        5-148

532-5            Recommended Water Supply Plan for theCity of Alamo Heights        5-149

532-6            Recommended Plan Costs by Decadefor the City of Alamo Heights        5-149

532-7            Recommended Water Supply Plan for the City of Balcones Heights        5-150

532-8            Recommended Plan Costs by Decade for the
City of Balcones Heights        5-151

532-9            Recommended Water Supply Plan for the City of China Grove        5-151

532-10          Recommended Plan Costs by Decade for the City of China Grove        5-152

532-11          Recommended Water Supply Plan for the City of Converse        5-153

532-12          Recommended Plan Costs by Decade for the City of Converse        5-153

532-13          Recommended Water Supply Plan for the City of Elmendorf        5-154

532-14          Recommended Plan Costs by Decade for the City of Elmendorf        5-154

532-15          Recommended Water Supply Plan for the City of Fair Oaks Ranch        5-155

532-16          Recommended Plan Costs by Decade for the
City of Fair Oaks Ranch        5-156

532-17          Recommended Water Supply Plan for the City of Helotes        5-157

532-18          Recommended Plan Costs by Decade for the City of Helotes        5-157

532-19          Recommended Water Supply Plan for the City of Kirby        5-158

532-20          Recommended Plan Costs by Decade for the City of Kirby        5-158

532-21          Recommended Water Supply Plan for the City of Leon Valley        5-159

532-22          Recommended Plan Costs by Decade for the City of Leon Valley        5-159

532-23          Recommended Water Supply Plan for the
Live Oak Water Public Utility        5-160

532-24          Recommended Plan Costs by Decade forthe
Live Oak Water Public Utility        5-160

532-25          Recommended Water Supply Plan for the City of Olmos Park        5-161

532-26          Recommended Plan Costs by Decade for the City of Olmos Park        5-161

532-27          Recommended Water Supply Plan for the City of San Antonio        5-163

532-28          Recommended Plan Costs by Decade for the City of San Antonio        5-164

532-29          Recommended Water Supply Plan for Schertz (Outside City)        5-165

532-30          Recommended Plan Costs by Decade for Schertz (Outside City)        5-165

532-31          Recommended Water Supply Plan for the City of Shavano Park        5-166

532-32          Recommended Plan Costs by Decade for the City of Shavano Park        5-166

532-33          Recommended Water Supply Plan for the City of St Hedwig        5-167

532-34          Recommended Plan Costs by Decade for the City of St Hedwig        5-167

532-35          Recommended Water Supply Plan for the City of Terrell Hills        5-168

532-36          Recommended Plan Costs by Decade for the City of Terrell Hills        5-169

532-37          Recommended Water Supply Plan for the City of Universal City        5-169

532-38          Recommended Plan Costs by Decade for the City of Universal City        5-170

532-39          Recommended Water Supply Plan for Windcrest        5-170

532-40          Recommended Plan Costs by Decade for Windcrest        5-171

532-41          Recommended Water Supply Plan for BMWD (Castle Hills)        5-172

532-42          Recommended Plan Costs by Decade for BMWD (Castle Hills)        5-173

532-43          Recommended Water Supply Plan for BMWD (Somerset)        5-174

532-44          Recommended Plan Costs by Decade for BMWD (Somerset)        5-174

532-45          Recommended Water Supply Plan for BMWD (Hill Ctry/HollwPk)        5-176

532-46          Recommended Plan Costs by Decade for
BMWD (Hill Ctry/HollwPk)        5-177

532-47          Recommended Water Supply Plan for BMWD (Other Subdivisions)        5-179

532-48          Recommended Plan Costs by Decade for
BMWD (Other Subdivisions)        5-180

532-49          Recommended Water Supply Plan for Fort Sam Houston        5-181

532-50          Recommended Plan Costs by Decade for Fort Sam Houston        5-182

532-51          Recommended Water Supply Plan for Lackland AFB        5-182

532-52          Recommended Plan Costs by Decade for Lackland AFB        5-183

532-53          Recommended Water Supply Plan for Randolph AFB        5-184

532-54          Recommended Plan Costs by Decade for Randolph AFB        5-184

532-55          Recommended Water Supply Plan for Rural Areas        5-185

532-56          Recommended Plan Costs by Decade for Rural Areas        5-185

532-57          Recommended Water Supply Plan for Industrial        5-186

532-58          Recommended Plan Costs by Decade for Industrial        5-186

532-59          Recommended Water Supply Plan for Mining        5-187

532-60          Recommended Plan Costs by Decade for Mining        5-188

532-61          Recommended Water Supply Plan for Irrigation        5-188

532-62          Recommended Plan Costs by Decade for Irrigation        5-189

533-1            Caldwell County Surplus/Shortage        5-191

533-2            Recommended Water Supply Plan for the City of Lockhart        5-192

533-3            Recommended Plan Costs by Decade for the City of Lockhart        5-192

533-4            Recommended Water Supply Plan for the City of Luling        5-193

533-5            Recommended Plan Costs by Decadefor the City of Luling        5-193

533-6            Recommended Water Supply Plan for the City of Martindale        5-194

533-7            Recommended Plan Costs by Decade for the City of Martindale        5-194

534-1            CalhounCounty Surplus/Shortage        5-197

534-2            Recommended Water Supply Plan for the City of Point Comfort        5-198

534-3            Recommended Plan Costs by Decade for the City of Point Comfort        5-198

534-4            Recommended Water Supply Plan forthe City of Port Lavaca        5-199

534-5            Recommended Plan Costs by Decade for the City of Port Lavaca        5-199

534-6            Recommended Water Supply Plan forthe City of Seadrift        5-200

534-7            Recommended Plan Costs by Decade for the City of Seadrift        5-200

535-1            ComalCounty Surplus/Shortage        5-203

535-2            Recommended Water Supply Plan for the City of Garden Ridge        5-204

535-3            Recommended Plan Costs by Decade for the City of Garden Ridge        5-204

535-4            Recommended Water Supply Plan forthe City of New Braunfels        5-206

535-5            Recommended Plan Costs by Decade for the City of New Braunfels        5-207

535-6            Recommended Water Supply Plan for Rural Areas        5-208

535-7            Recommended Plan Costs by Decade for Rural Areas        5-209

535-8            Recommended Water Supply Plan for Industrial        5-210

535-9            Recommended Plan Costs by Decade for Industrial        5-210

535-10          Recommended Water Supply Plan for Mining        5-211

535-11          Recommended Plan Costs by Decade for Mining        5-211

536-1            DeWittCounty Surplus/Shortage        5-213

536-2            Recommended Water Supply Plan for the City of Cuero        5-214

536-3            Recommended Plan Costs by Decade for the City of Cuero        5-214

536-4            Recommended Water Supply Plan for the City of Yoakum        5-214

536-5            Recommended Plan Costs by Decadefor the City of Yoakum        5-215

536-6            Recommended Water Supply Plan for the City of Yorktown        5-215

536-7            Recommended Plan Costs by Decade for the City of Yorktown        5-215

537-1            DimmitCounty Surplus/Shortage        5-217

537-2            Recommended Water Supply Plan for the City of Big Wells        5-218

537-3            Recommended Plan Costs by Decade for the City of Big Wells        5-218

537-4            Recommended Water Supply Plan forthe City of Carrizo Springs        5-219

537-5            Recommended Plan Costs by Decade for the City of Carrizo Springs        5-219

538-1            FrioCounty Surplus/Shortage        5-221

538-2            Recommended Water Supply Plan for the City of Dilley        5-221

538-3            Recommended Plan Costs by Decade for the City of Dilley        5-222

538-4            Recommended Water Supply Plan for the City of Pearsall        5-222

538-5            Recommended Plan Costs by Decade for the City of Pearsall        5-222

538-6            Recommended Water Supply Plan for Irrigation        5-224

538-7            Recommended Plan Costs by Decade for Irrigation        5-224

539-1            GoliadCounty Surplus/Shortage        5-225

539-2            Recommended Water Supply Plan for the City of Goliad        5-226

539-3            Recommended Plan Costs by Decadefor the City of Goliad        5-226

5310-1          Gonzales County Surplus/Shortage        5-229

5310-2          Recommended Water Supply Plan for the City of Gonzales        5-230

5310-3          Recommended Plan Costs by Decade for the City of Gonzales        5-230

5310-4          Recommended Water Supply Plan for theCity of Nixon        5-230

5310-5          Recommended Plan Costs by Decade for the City of Nixon        5-231

5310-6          Recommended Water Supply Plan for the City of Waelder        5-231

5310-7          Recommended Plan Costs by Decade for the City of Waelder        5-231

5311-1          Guadalupe County Surplus/Shortage        5-233

5311-2          Recommended Water Supply Plan for the City of Cibolo        5-234

5311-3          Recommended Plan Costs by Decade for the City of Cibolo        5-234

5311-4          Recommended Water Supply Plan for the City of Marion        5-235

5311-5          Recommended Plan Costs by Decade for the City of Marion        5-235

5311-6          Recommended Water Supply Plan for McQueeney        5-236

5311-7          Recommended Plan Costs by Decade for McQueeney        5-236

5311-8          Recommended Water Supply Plan for the City of Schertz        5-237

5311-9          Recommended Plan Costs by Decade for the City of Schertz        5-237

5311-10        Recommended Water Supply Plan for the City of Sequin        5-238

5311-11        Recommended Plan Costs by Decade for the City of Sequin        5-238

5311-12        Recommended Water Supply Plan for Rural Areas        5-239

5311-13        Recommended Plan Costs by Decade for Rural Areas        5-240

5311-14        Recommended Water Supply Plan for Industrial        5-241

5311-15        Recommended Plan Costs by Decade for Industrial        5-241

5311-16        Recommended Water Supply Plan forSteam-Electric Power        5-242

5311-17        Recommended Plan Costs by Decade for Steam-Electric Power        5-242

5311-18        Recommended Water Supply Plan for Mining        5-243

5311-19        Recommended Plan Costs by Decade for Mining        5-243

5312-1          Hays County Surplus/Shortage        5-245

5312-2          Recommended Water Supply Plan for the City of Kyle        5-246

5312-3          Recommended Plan Costs by Decade for the City of Kyle        5-247

5312-4          Recommended Water Supply Plan for the City of San Marcos        5-248

5312-5          Recommended Plan Costs by Decade for the City of San Marcos        5-249

5312-6          Recommended Water Supply Plan for the City of Wimberley        5-250

5312-7          Recommended Plan Costs by Decade forthe City of Wimberley        5-250

5312-8          Recommended Water Supply Plan for the City of Woodcreek        5-251

5312-9          Recommended Plan Costs by Decade forthe City of Woodcreek        5-251

5312-10        Recommended Water Supply Plan for RuralAreas        5-252

5312-11        Recommended Plan Costs by Decade for Rural Areas        5-253

5312-12        Recommended Water Supply Plan for Mining        5-254

5312-13        Recommended Plan Costs by Decade for Mining        5-254

5313-1          KarnesCounty Surplus/Shortage        5-255

5313-2          Recommended Water Supply Plan for the City of Karnes City        5-256

5313-3          Recommended Plan Costs by Decade for the City of Karnes City        5-256

5313-4          Recommended Water Supply Plan for the City of Kenedy        5-256

5313-5          Recommended Plan Costs by Decade for the City of Kenedy        5-257

5313-6          Recommended Water Supply Plan for the City of Runge        5-257

5313-7          Recommended Plan Costs by Decade forthe City of Runge        5-257

5314-1          Kendall County Surplus/Shortage        5-259

5314-2          Recommended Water Supply Plan for the City of Boerne        5-260

5314-3          Recommended Plan Costs by Decade for the City of Boerne        5-260

5314-4          Recommended Water Supply Plan for theCity of Comfort        5-261

5314-5          Recommended Plan Costs by Decade for the City of Comfort        5-261

5314-6          Recommended Water Supply Plan forRural Areas        5-262

5314-7          Recommended Plan Costs by Decade for Rural Areas        5-262

5314-8          Recommended Water Supply Plan for Industrial        5-263

5314-9          Recommended Plan Costs by Decade for Industrial        5-263

5315-1          LaSalleCounty Surplus/Shortage        5-265

5315-2          Recommended Water Supply Plan for the City of Cotulla        5-266

5315-3          Recommended Plan costs by Decade for the City of Cotulla        5-266

5315-4          Recommended Water Supply Plan for the City of Encinal        5-266

5315-5          Recommended Plan Costs by Decade for the City of Encinal        5-267

5316-1          Medina County Surplus/Shortage        5-269

5316-2          Recommended Water Supply Plan for the City of Castroville        5-270

5316-3          Recommended Plan Costs by Decade for the City of Castroville        5-270

5316-4          Recommended Water Supply Plan for the City of Devine        5-271

5316-5          Recommended Plan Costs by Decade for the City of Devine        5-271

5316-6          Recommended Water Supply Plan for the City of Hondo        5-272

5316-7          Recommended Plan Costs by Decade for the City of Hondo        5-272

5316-8          Recommended Water Supply Plan for the City of La Coste        5-273

5316-9          Recommended Plan Costs by Decade forthe City of La Coste        5-274

5316-10        Recommended Water Supply Plan for the City of Natalia        5-274

5316-11        Recommended Plan Costs by Decade for the City of Natalia        5-275

5316-12        Recommended Water Supply Plan for Rural Areas        5-275

5316-13        Recommended Plan Costs by Decade forRural Areas        5-276

5316-14        Recommended Water Supply Plan for Mining        5-276

5316-15        Recommended Plan Costs by Decade for Mining        5-277

5316-16        Recommended Water Supply Plan for Irrigation        5-278

5316-17        Recommended Plan Costs by Decade for Irrigation        5-278

5317-1          RefugioCounty Surplus/Shortage        5-279

5317-2          Recommended Water Supply Plan for the City of Refugio        5-280

5317-3          Recommended Plan Costs by Decade for the City of Refugio        5-280

5317-4          Recommended Water Supply Plan for the City of Woodsboro        5-280

5317-5          Recommended Plan Costs by Decade for the City of Woodsboro        5-281

5318-1          Uvalde County Surplus/Shortage        5-283

5318-2          Recommended Water Supply Plan for the City of Sabinal        5-284

5318-3          Recommended Plan Costs by Decade for the City of Sabinal        5-284

5318-4          Recommended Water Supply Plan for the City of Uvalde        5-285

5318-5          Recommended Plan Costs by Decade for the City of Uvalde        5-286

5318-6          Recommended Water Supply Plan for Irrigation        5-287

5318-7          Recommended Plan Costs by Decade for Irrigation        5-287

5319-1          VictoriaCounty Surplus/Shortage        5-289

5319-2          Recommended Water Supply Plan for the City of Bloomington        5-290

5319-3          Recommended Plan Costs by Decade forthe City of Bloomington        5-290

5319-4          Recommended Water Supply Plan for the City of Victoria        5-291

5319-5          Recommended Plan Costs by Decade for the City of Victoria        5-291

5320-1          Wilson County Surplus/Shortage        5-293

5320-2          Recommended Water Supply Plan for theCity of Floresville        5-294

5320-3          Recommended Plan Costs by Decade for the City of Floresville        5-294

5320-4          Recommended Water Supply Plan for the City of La Vernia        5-295

5320-5          Recommended Plan Costs by Decade for the City of La Vernia        5-295

5320-6          Recommended Water Supply Plan for the City of Poth        5-296

5320-7          Recommended Plan Costs by Decade for the City of Poth        5-296

5320-8          Recommended Water Supply Plan for the City of Stockdale        5-296

5320-9          Recommended Plan Costs by Decade for the City of Stockdale        5-297

5321-1          ZavalaCounty Surplus/Shortage        5-299

5321-2          Recommended Water Supply Plan for the City of Batesville        5-300

5321-3          Recommended Plan Costs by Decade for the City of Batesville        5-300

5321-4          Recommended Water Supply Plan for the City of Crystal City        5-300

5321-5          Recommended Plan Costs by Decade for the City of Crystal City        5-301

5321-6          Recommended Water Supply Plan for the City of La Pryor        5-301

5321-7          Recommended Plan Costs by Decade for the City of La Pryor        5-302

5321-8          Recommended Water Supply Plan forIrrigation        5-303

5321-9          Recommended Plan Costs by Decade for Irrigation        5-303

54-1               Major Water Provider Surplus/Shortage        5-305

54-2               Recommended Water Supply Planfor the
Regional Water Provider(s) for Bexar County        5-307

54-3               Recommended Plan Costs by Decade for the
Regional Water Provider(s) for Bexar County        5-308

54-4               Recommended Water Supply Plan for SAWS        5-310

54-5               Recommended Plan Costs by Decadefor SAWS        5-311

54-6               Recommended Water Supply Plan for BMWD        5-314

54-7               Recommended Plan Costs by Decade for BMWD        5-315

54-8               Recommended Water Supply Plan for CRWA        5-316

54-9               Recommended Plan Costs by Decade for CRWA        5-317

54-10             Recommended Water Supply Plan for NBU        5-319

54-11             Recommended Plan Costs by Decade for NBU        5-319

54-12             Recommended Water Supply Plan for the City of San Marcos        5-321

54-13             Recommended Plan Costs by Decade for the City of San Marcos        5-321

 

Table A           Projected Irrigation Water Needs - South Central Texas Region (Supplement 1, Section 6)

Table B          Estimates of Income from Irrigation to Produce Crops    Table B Cont. (Supplement 1, Section 6)

Table 7.1     Comment Categories and NumberReceived per Category          7-13