Cover Sheets:
Cover
Page Table
of contents graphic Region
- (small map)
Executive Summary graphics
ES-1
South
Central Texas Planning Region (Region L)
ES-2
Plan
Structure
ES-3
Projected
Water Demands
ES-4
Distribution
of Total Demand Among Users
ES-5
Supply,
Demand, and Need (Shortage)
ES-6
Projected
Water Needs (Shortages)
ES-7
Counties
with Projected Municipal Needs (Shortages)
ES-8
Cities
with Projected Needs (Shortages)
ES-9
Counties
with Projected Industrial Needs (Shortages)
ES-10
Counties
with Projected Steam-Electric Needs (Shortages)
ES-11
Counties
with Projected Irrigation Needs (Shortages)
ES-12
Counties
with Projected Mining Needs (Shortages)
ES-13
Regional
Planning Process.
ES-14
Sources
of New Supply
ES-15
Phased
Implementation of Water Management Strategies
ES-16
Regional
Water Plan Annual Cost of Cumulative Additional Water Supply
ES-17
Regional
Water Plan Unit Cost of Cumulative Additional Water Supply
Table ES-3 Regional
Water Supply Plan Summary
Regional Water Plan for Counties and for Major Water Providers:
Bexar County: a b c d
Caldwell, Calhoun and Comal Counties
Dimmitt, Frio and Goliad Counties
Gonzales and Guadalupe Counties
Hays, Karnes and Kendall Counties
LaSalle, Medina and Regugio Counties
Uvalde, Victoria and Wilson Counties
Zavala, Regional Provider, SAWS Major Providers, continued
Section 1 - Figures 1-1 to 1-6
1-1 Eco-Regions
South Central Texas Region
1-2
Percentages of Population Residing in Urban and Rural Areas (1990)
1-3 Age
Distribution of the Population (1990)
1-4 Level
of Educational Achievement (1990)
1-5 Major
Aquifers
1-6 River
Basins, Coastal Basins, Reservoirs, and Lakes
Section 2 - Figures 2-1 to 2-6
2-1 Summary
of South Central Texas Regions Projected Population
2-2 Projected
Per Capita Water Use and Municipal Water Demand
2-3 Projections
of Industrial, Steam-Electric, and Mining Water Demands
2-4 Projections of Irrigation Water Demands
2-5 Projections of Livestock Water Demands
2-6 Total Water Demand Projections
Section
3 - Figures 3-1 and 3-2
3-1 Major
Aquifers South Central Texas Region
3-2 River
Basins, Coastal Basins, Reservoirs, and Lakes (South Central Texas Region)
Section
5 - Figures 5.2-1 to 5.2-45
5.1-1 Planning
Process
5.2-1 Regional Water Plan South Central Texas
Region L - Regional Water Planning Area
5.2-2 Regional Water Plan
5.2-3 Regional
Water Plan Annual Cost of Cumulative Additional Water Supply
5.2-4 Regional
Water Plan Unit Cost of Cumulative Additional Water Supply
5.2-5 Regional
Water Plan Atascosa County: Graph
and Table
5.2-6 Regional
Water Plan Bexar County: Graph and Table
5.2-7 Regional
Water Plan Caldwell County: Graph and Table
5.2-8 Regional
Water Plan Calhoun County: Graph and Table
5.2-9 Regional
Water Plan Comal County: Graph and Table
5.2-10 Regional
Water Plan DeWitt County: Graph
and Table
5.2-11 Regional
Water Plan Dimmit County: Graph
and Table
5.2-12 Regional
Water Plan Frio County: Graph and Table
5.2-13 Regional
Water Plan Goliad County: Graph
and Table
5.2-14 Regional
Water Plan Gonzales County: Graph
and Table
5.2-15 Regional
Water Plan Guadalupe County: Graph
and Table
5.2-16 Regional
Water Plan Hays County: Graph
and Table
5.2-17 Regional
Water Plan Karnes County: Graph
and Table
5.2-18 Regional
Water Plan Kendall County: Graph
and Table
5.2-19 Regional
Water Plan La Salle County: Graph
and Table
5.2-20 Regional
Water Plan Medina County: Graph
and Table
5.2-21 Regional
Water Plan Refugio County: Graph
and Table
5.2-22 Regional
Water Plan Uvalde County: Graph
and Table
5.2-23 Regional
Water Plan Victoria County: Graph and Table
5.2-24 Regional
Water Plan Wilson County: Graph
and Table
5.2-25 Regional
Water Plan Zavala County: Graph and Table
5.2-26 Regional
Water Plan Simulated Comal Springs Discharge
5.2-27 Regional
Water Plan Simulated San Marcos Springs Discharge
5.2-28 Regional
Water Plan Simulated Edwards Aquifer Pumpage
5.2-29 Regional Water Plan Simulated Edwards Aquifer
Levels
5.2-30 Regional Water Plan Additional Carrizo
Groundwater Pumpage
5.2-31 Regional
Water Plan Simulated Carrizo Aquifer Drawdown
5.2-32 Regional
Water Plan Carrizo Aquifer
5.2-33 Regional
Water Plan Carrizo Aquifer
5.2-34 Regional
Water Plan Carrizo Aquifer
5.2-35 Regional
Water Plan Carrizo Aquifer
5.2-36 Regional
Water Plan Carrizo Aquifer
5.2-37 Simsboro Aquifer in CPS-ALCOA Area Drawdown
between Years 2000 and 2050 for 55,000 acft/yr Water Supply.
5.2-38 Regional
Water Plan Simsboro Aquifer
5.2-39 Regional
Water Plan Simsboro Aquifer
5.2-40 Regional
Water Plan Streamflow Comparisons
5.2-41 Regional
Water Plan Streamflow Comparisons
5.2-42 Regional
Water Plan Streamflow Comparisons
5.2-43 Regional
Water Plan Streamflow Comparisons
5.2-44 Omernicks
Ecoregions for the Regional Water Plan within Region L
5.2-45 Goulds
Vegetational Areas for the Regional Water Plan within Region L
Section
6 - Supplement 1
Table B Estimates
of Income from Irrigation to Produce Crops Table
B Cont.
Figure 1 Economic
Feasibility of Meeting Projected Irrigation Water Needs
Section 7
Graph I Criteria
Survey Results
Appendix C
Reliability Apendix - Water Rights
Top