5.3.5    Comal County Water Supply Plan

Table 5.3.5-1 lists each water user group in Comal County and their corresponding surplus or shortage in years 2030 and 2050.  For each water user group with a projected shortage, or need, a water supply plan has been developed and is presented in the following subsections.

Table 5.3.5-1.
Comal County Surplus/Shortage

Water User Group

Surplus/Shortage1

Comment

2030
(acft/yr)

2050
(acft/yr)

City of Fair Oaks Ranch

 

 

See Bexar County

City of Garden Ridge

-562

-617

Projected shortage – see plan below

City of New Braunfels

-14,801

-21,051

Projected shortage – see plan below

City of Schertz

 

 

See Guadalupe County

Rural Area Residential and Commercial

-11,094

-19,601

Projected shortage – see plan below

Industrial

1

-551

Projected shortage – see plan below

Steam-Electric Power

0

0

No projected demand

Mining

-5,796

-2,224

Projected shortage – see plan below

Irrigation

631

665

Projected surplus

Livestock

0

0

No projected surplus/shortage

1    From Table 4-5, Section 4.1 – Water Needs Projections by Water User Group.

5.3.5.1     City of Fair Oaks Ranch (See Bexar County)

5.3.5.2     City of Garden Ridge

The City of Garden Ridge’s current water supply is obtained from the Edwards Aquifer.  The City of Garden Ridge is projected to need additional water supplies beginning in the year 2000.  The following options were considered to meet the city’s projected need:

§         Demand Reduction (Conservation) (L-10 Mun.)

§         Canyon Reservoir – River Diversion (G-15C)

§         Carrizo Aquifer – Gonzales & Bastrop (CZ-10D)

Working within the planning criteria established by the SCTRWPG and the TWDB, it is recommended that the City of Garden Ridge implement the following water supply plan to meet the projected need for the city (Table 5.3.5-2).

§         Municipal demand reduction (conservation) to be implemented in 2000.  This project can provide an additional 35 acft/yr of supply in 2000, increasing to 41 acft/yr of additional supply in 2050.  (See Section 6, Supplement 2 and Volume III, Section 1.1)

§         Canyon Reservoir – River Diversion (G-15C) to be implemented in 2000.  This project can provide an additional 400 acft/yr of supply in 2000, increasing to 700 acft/yr of additional supply in 2050.

Table 5.3.5-2.
Recommended Water Supply Plan for the City of Garden Ridge

 

2000 (acft/yr)

2010 (acft/yr)

2020 (acft/yr)

2030 (acft/yr)

2040 (acft/yr)

2050 (acft/yr)

Projected Need (Shortage)

322

395

434

562

623

617

Recommended Plan

 

 

 

 

 

 

Demand Reduction (Conservation) (L-10 Mun.)

35

40

46

38

41

41

Canyon Reservoir – River Diversion (G-15C)

400

450

500

700

700

700

Total New Supply

435

490

546

738

741

741

The costs of the recommended plan to meet the City of Garden Ridge’s projected need are shown in Table 5.3.5-3.

Table 5.3.5-3.
Recommended Plan Costs by Decade for the City of Garden Ridge

Plan Element

2000

2010

2020

2030

2040

2050

Demand Reduction (Conservation) (L-10 Mun.)

 

 

 

 

 

 

Annual Cost ($/yr)

$10,503

$10,271

$10,037

$3,951

$3,719

$3,249

Unit Cost ($/acft)

$300

$257

$218

$104

$91

$79

Canyon Reservoir – River Diversion (G-15C)

 

 

 

 

 

 

Annual Cost ($/yr)

$310,983

$349,856

$371,500

$440,300

$440,300

$440,300

Unit Cost ($/acft)

$777

$777

$743

$629

$629

$629

5.3.5.3     City of New Braunfels

The City of New Braunfels’ current water supply is obtained from the Edwards Aquifer, Canyon Reservoir and run-of-river rights.  The City of New Braunfels is projected to need additional water supplies beginning in the planning year 2010.  The following options were considered to meet the city’s projected need:

§         Demand Reduction (Conservation) (L-10 Mun.)

§         Canyon Reservoir – River Diversion (G-15C)

§         GBRA Canyon Reservoir Contract Renewal

§         Carrizo Aquifer – Gonzales & Bastrop (CZ-10D)

§         Additional Storage (ASR and/or Surface)

Working within the planning criteria established by the SCTRWPG and the TWDB, it is recommended that the City of New Braunfels implement the following water supply plan to meet the projected need for the city (Table 5.3.5-4).

§         Municipal demand reduction (conservation) to be implemented in 2000.  This project can provide an additional 583 acft/yr of supply in 2000, increasing to 904 acft/yr of additional supply in 2050.  (See Section 6, Supplement 2 and Volume III, Section 1.1)

§         Canyon Reservoir – River Diversion (G-15C) to be implemented in 2000.  This project can provide an additional 580 acft/yr of supply in 2000, increasing to 10,000 acft/yr of additional supply in 2030 through 2050.

§         GBRA Canyon Reservoir Contract Renewal to be implemented in 2001.  This project can provide an additional 6,720 acft/yr of supply.

§         Carrizo Aquifer – Gonzales & Bastrop (CZ-10D) to be implemented in 2040.  This project can provide an additional 4,000 acft/yr of supply in 2040, increasing to 7,000 acft/yr of additional supply in 2050.

§         Additional Storage (ASR and/or Surface)


Table 5.3.5-4.
Recommended Water Supply Plan for the City of New Braunfels

 

2000 (acft/yr)

2010 (acft/yr)

2020 (acft/yr)

2030 (acft/yr)

2040 (acft/yr)

2050 (acft/yr)

Projected Need (Shortage)

0

7,817

10,697

14,801

17,765

21,051

Recommended Plan

 

 

 

 

 

 

Demand Reduction (Conservation) (L-10 Mun.)

583

680

804

683

785

904

Canyon Reservoir – River Diversion (G-15C)

580

580

7,200

10,000

10,000

10,000

GBRA Canyon Reservoir Contract Renewal

 

6,720

6,720

6,720

6,720

6,720

Carrizo Aquifer – Gonzales & Bastrop (CZ-10D)1

 

 

 

 

4,000

7,000

Additional Storage (ASR and/or Surface)2

 

 

 

 

 

 

Total New Supply

1,163

7,980

14,724

17,403

21,505

24,624

1 Region L estimates of groundwater development exceed Region K estimates of availability in and beyond 2030.  The regions have agreed that discussion of differences will be more productive upon completion of new Groundwater Availability Models.

2 Includes, but is not limited to, small reservoirs near regional water treatment facilities to provide balancing storage necessary to meet peak seasonal and daily water needs.

The costs of the recommended plan to meet the City of New Braunfels’ projected need are shown in Table 5.3.5-5.

Table 5.3.5-5.
Recommended Plan Costs by Decade for the City of New Braunfels

Plan Element

2000

2010

2020

2030

2040

2050

Demand Reduction (Conservation) (L-10 Mun.)